THREE WAYS VERTEQ PAYS FOR ITSELF
One product. Three ways to win on your project.
Every concrete project has a bottleneck. Some are bleeding money on schedule. Some are over-buying cement to lift early. Some are facing carbon mandates they can't meet with conventional mixes. VerteQ solves each of them differently.
1
Schedule Acceleration
FOR THE OWNER
Cut weeks off the structural shell. On a single 500,000 sf tilt-up data center, that's ~55 days off the panel campaign - and ~$1.6M of construction-loan and general-conditions cost the owner stops carrying.
~14×
return on admixture spend, carry-cost only
2
Material Substitution
FOR THE CONTRACTOR
Contractors over-design tilt walls to lift early - at the cost of $73K–$117K of extra cement on a single building. VerteQ delivers the same early lift strength without the extra cement. Same outlay, less material, scoreable carbon reduction.
275 t
cement avoided per building (walls only)
3
Design Optimization
FOR THE ENGINEER & OWNER
Spec at 3,000 psi. Break at 5,000+ psi in sealed 28-day tests. The strength margin lets engineers safely specify lower design strengths - capturing lower delivered concrete cost and dramatic embodied-carbon reduction across walls, slab, and beyond.
1,200 t
CO₂ avoided per 500,000 sf building
WHERE VERTEQ IS BEING DEPLOYED
Application-agnostic. From tilt-up panels to mass infrastructure.
VerteQ is dispensed through standard ready-mix equipment at 3 lb per cubic yard (1.8 kg/m³). It performs across tilt-up panels, slabs-on-grade, footings, columns, beams, and any structural concrete pour. Validated on conventional Type I/II portland cements - the chemistry that still dominates international markets - with Type III and Type 1L (portland-limestone) compatibility programs in progress.
HYPERSCALE
Data Centers
Revenue-at-stake buildings where every day of carry is real money. VerteQ pulls cure time off the critical path and unlocks earlier delivery on tilt-up shells.
Tilt-up panels
Equipment slabs
Carbon mandates
LUXURY
Resorts & Hospitality
Coastal builds with saltwater exposure and tight grand-opening schedules. Stronger, longer-lived concrete in less time - without changing the construction crew's workflow.
Costa Rica resorts
Saltwater durability
Schedule-driven
SOVEREIGN
Infrastructure & Stadiums
Saudi Vision 2030. FIFA 2034 stadium build-out. Highway and civil infrastructure. Sovereign-scale programs where carbon scrutiny on every yard meets schedules measured in days.
Vision 2030
FIFA 2034
DOT carbon rules
THE EXECUTIVE TEAM
Built by people who've already done it.
AW

Adam Wemhaner
President & CEO · Principal
View bio
GL

Dr. Greg Leman
Chief Technology Officer · Principal
View bio
RR

Rey Rubio, PE CGC
Inventor & Technical Advisor · Principal
View bio
AW

Ann Waltos
VP Sales & Marketing · Principal
View bio
PR

Pavi Ramdehalchand
VP Manufacturing · Principal
View bio
DR

David Rojek
VP Business Development · Principal
View bio
Click any team member for a short bio. Full bios available on request.